PROGRESS UPDATE OF PHODONG VILLAGE IN JUNE 2021

Construction progress update of PhoDong Village model green urban area of the developer – Saigon Construction Corporation (SCC) – in June 2021.

With a total area of 41ha, low construction density of only 24.09%, PhoDong Village is proud to be a model green urban area project, scaled, planned and developed infrastructure synchronously.

Below are photos of the construction progress of zones B and E of PhoDong Village urban area up to the present time, in which:

♦ Zone B: Townhouses

From B1 to B13: under construction of the second-floor beam and slab reinforcement

From B21 to B33: under construction of the third-floor beam and slab reinforcement

♦ Zone E: Terraced House

From E1 to E6: under construction of the second-floor

From E22 to E30: under construction of the third-floor


Zones B and E of PhoDong Village urban area started construction from March 2021


Zone B – Townhouses – under construction of the floor beam and slab reinforcement


Zone B – Townhouses – under construction of the floor beam and slab reinforcement

Zone B – Townhouses – under construction of the floor beam and slab reinforcement


Zone B – Townhouses – under construction of the floor beam and slab reinforcement


Zone E – Terraced House – under construction of the second and third floor